Boiler sequencing, plant room controls and Legionella-compliant hot water monitoring — designed, integrated and repaired by BMS engineers, on any head-end you already run.
Lost communications between boiler controller and BMS head-end, a failed sensor input, or a points mapping issue after a setpoint change.
Storage or outlet temperatures drifting out of range — often a calibration or sequencing fault rather than a boiler fault itself.
Lead/lag logic firing the wrong boiler first, short-cycling plant and wasting fuel across a multi-boiler installation.
Temperature logs missing readings or falling outside ACOP L8 thresholds — traced, corrected and documented.
Integrate boiler plant, pumps and valves into a building's BMS head-end for centralised monitoring and control.
Lead/lag sequencing setup and tuning across multi-boiler plant, plus safety interlocks between boilers and associated plant.
Continuous BMS monitoring of storage and outlet temperatures against ACOP L8 / HSG274, with logging and alarms.
Modern controls fitted into ageing plant rooms — new panels, sequencing and remote monitoring without a full strip-out.
Fault history tracing and root-cause diagnosis for recurring lockouts, not just a reset and walk-away.
24/7 response for total loss of heating or hot water, with same-day attendance for commercial sites.
Heathandles designs, integrates and repairs boiler and plant room controls at the BMS level for commercial and industrial buildings across the UK, including sequencing, interlocks and hot water compliance. 24/7 emergency, same-day callout available.
Usually a failed communications link between the boiler controller and the BMS head-end, a faulty sensor input, or a sequencing fault after a firmware or setpoint change. We diagnose and restore control on-site.
Continuous BMS monitoring of hot water storage and outlet temperatures against ACOP L8 / HSG274 thresholds, with logged data and alarms if temperatures drift out of the compliant range.
Yes. We commission new boiler plant into an existing BMS head-end without replacing it, mapping points and setting up sequencing, schedules and alarms to match the rest of the building.
Cost depends on the fault type, the number of boilers or zones affected, and the existing BMS platform. We provide a fixed quote after a site survey.
Yes. We integrate boiler and plant room controls with Trend, Tridium/Niagara, Honeywell, Schneider EcoStruxure and Johnson Controls Metasys, regardless of who installed the original system.
Sequencing controls which boilers fire and in what order across a multi-boiler plant room, based on demand. Poor sequencing wastes fuel and shortens boiler life; correct sequencing is set and tuned at the BMS.
Yes. We retrofit ageing plant rooms with modern BMS controls, replacing outdated panels and wiring in sequencing, interlocks and remote monitoring without a full mechanical strip-out.
Emergency requests get a call back straight away, 24/7. Everything else, the same working day.
Prefer to talk? Call 020 4548 4313